Power plant & controls for a DP1 electric propelled cable Lay Vessel.

img_20181231_090545_fotor

The technical team at Tritek has been working round the clock since first week of December 2018 on the design, engineering and assembling of Main Switchboard, power management system and Propulsion Controls for Retractable Azimuth Thruster for a Dynamic Positioning Cable laying vessel conversion project. The propulsion power plant consists of 6 X 1000KVA Diesel Generators units.

The project is for Cova Group Holdings LTD, and is on a very tight schedule delivery, the switchboards and controls systems are to be delivered in 6 weeks and shipped to the far east for installation on the vessel.

cova-project-1                  cova-project-2_fotor